| Aug-2026 |
A
|
UFGS 01 32 01.00 10 Project Schedule |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 01 33 00 Submittal Procedures |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 01 33 16.00 10 Design Data (Design After Award) |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
N
|
UFGS 01 35 26 Governmental Safety Requirements |
May-2024 |
C
|
2 |
Added Army tailoring to reflect utilization of the construction contract system of record; corrected multiple URLs; added notes to guide appropriate level of SSHO; incorporated various administrative items including removing redundancies. |
| Aug-2026 |
A
|
UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) |
Nov-2023 |
C
|
1 |
Added guidiance for the transition to the Construction Management Platform (CMP) |
| Aug-2026 |
N
|
UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) |
Aug-2023 |
C
|
4 |
Added Army tailoring to reflect utilization of the construction contract system of record. |
| Aug-2026 |
A
|
UFGS 01 50 00 Temporary Construction Facilities and Controls |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 01 74 19 Construction Waste Management and Disposal |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 01 78 00 Closeout Submittals |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
N
|
UFGS 01 78 23 Operation and Maintenance Data |
May-2023 |
C
|
4 |
In response to CCR 17601, added COMMISSIONING AUTHORITY tailoring in paragraph Training Content (3.1.2); added Army-only section reference in submittal paragraph, and updated options for submitting electronic copies in paragraphs Operation and Maintenance Manual Media, Removable Media Labels, and Training Video Recording. |
| Aug-2026 |
A
|
UFGS 03 33 00 Cast-In-Place Architectural Concrete |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 03 37 00 Preplaced-Aggregate Concrete |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 03 37 13 Shotcrete |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 03 41 16.08 Precast Concrete Slabs (Max. Span 8 feet O.C.) |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 03 41 33 Precast Structural Pretensioned Concrete |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 03 42 13.00 10 Plant-Precast Concrete Products for Below Grade Construction |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 09 72 00 Wallcoverings |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 09 84 20 Acoustical Wall Panels |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
N
|
UFGS 09 90 00 Architectural Paints and Coatings |
Aug-2026 |
R
|
|
Complete review and update, including title change from "PAINTS AND COATINGS" to "ARCHITECTURAL PAINTS AND COATINGS". |
| Aug-2026 |
A
|
UFGS 09 96 00 Heat- and Chemical-Resistant Coatings |
Aug-2026 |
R
|
|
Complete review and update, including title change from High-Performance Coatings to Heat- and Chemical-Resistant Coatings. |
| Aug-2026 |
A
|
UFGS 09 97 13 High-Performance Steel Coatings |
Aug-2026 |
N
|
|
New Section superseding UFGS 09 97 13.16 INTERIOR COATING OF WELDED STEEL WATER TANKS, UFGS 09 97 13.26 COATING OF STEEL WATERFRONT STRUCTURES, ZERO VOC, (SZC) SPLASH ZONE COATING, and UFGS 09 97 13.27 HIGH PERFORMANCE COATING FOR STEEL STRUCTURES. |
| Aug-2026 |
N
|
UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks |
May-2011 |
D
|
|
Superseded by UFGS-09 97 13 HIGH PERFORMANCE STEEL COATINGS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
N
|
UFGS 09 97 13.26 Coating of Steel Waterfront Structures, Zero VOC, (SZC) Splash Zone Coating |
Feb-2016 |
D
|
|
Superseded by UFGS-09 97 13 HIGH PERFORMANCE STEEL COATINGS.Note: This Section had an "inactive" status as it conflicted with FAR requirements. |
| Aug-2026 |
N
|
UFGS 09 97 13.27 High Performance Coating for Steel Structures |
Feb-2021 |
D
|
|
Superseded by UFGS-09 97 13 HIGH PERFORMANCE STEEL COATINGS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
A
|
UFGS 10 14 00.10 Exterior Signage |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
N
|
UFGS 11 53 00 Laboratory Fumehoods and Biological Safety Cabinets |
Aug-2026 |
R
|
|
Complete review and update, including title change from "LABORATORY EQUIPMENT AND FUMEHOODS" to "LABORATORY FUMEHOODS AND BIOLOGICAL SAFETY CABINETS". |
| Aug-2026 |
N
|
UFGS 12 22 00 Curtains and Drapes |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 12 50 00.13 10 Furniture and Furniture Installation |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 12 59 00 Systems Furniture |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
N
|
UFGS 13 21 48 Prefabricated Audiometric Rooms |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
N
|
UFGS 13 34 19 Metal Building Systems |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
N
|
UFGS 21 22 00 Clean Agent Fire Extinguishing Systems |
Aug-2026 |
N
|
|
New Section to address clean agent fire extinguishing systems. |
| Aug-2026 |
A
|
UFGS 22 13 29 Sanitary Sewerage Pumps |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 23 50 52 Central High Temperature Water (HTW) Generating Plants |
Aug-2026 |
N
|
|
Superseding UFGS 23 50 52.00 10 CENTRAL HIGH TEMPERATURE WATER (HTW) GENERATING PLANT AND AUXILIARIES. |
| Aug-2026 |
N
|
UFGS 23 52 00.01 Low Pressure (<260 psig) Water Heating Boilers (Under 6,000,000 Btu/hr Input) |
Aug-2026 |
N
|
|
New Section superseding UFGS-23 52 00 HEATING BOILERS and UFGS-23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR OUTPUT) |
| Aug-2026 |
N
|
UFGS 23 52 00.02 Low Pressure (<260 psig) Water Heating Boilers (Over 6,000,000 Btu/hr Input) |
Aug-2026 |
N
|
|
New Section superseding UFGS-23 52 00 HEATING BOILERS and UFGS-23 52 46.00 20 LOW PRESSURE WATER HEATING BOILERS (OVER 800,000 BTU/HR OUTPUT) |
| Aug-2026 |
N
|
UFGS 23 52 00.03 Steam Boilers and Equipment (400,000 - 6,000,000 Btu/hr Input) |
Aug-2026 |
N
|
|
New Section superseding UFGS-23 52 00 HEATING BOILERS and UFGS-23 52 49.00 20 STEAM BOILERS AND EQUIPMENT (500,000 - 18,000,000 BTU/HR) |
| Aug-2026 |
N
|
UFGS 23 52 00.04 Steam Boilers And Equipment (Over 6,000,000 Btu/Hr) Input |
Aug-2026 |
N
|
|
New Section superseding UFGS-23 52 00 HEATING BOILERS and UFGS-23 52 53.00 20 STEAM BOILERS AND EQUIPMENT (18,000,000 - 60,000,000 BTU/HR) |
| Aug-2026 |
A
|
UFGS 23 52 30 Heat Recovery Boilers |
Aug-2026 |
N
|
|
New section; Superseding UFGS 23 52 30.00 10 HEAT RECOVERY BOILERS, UFGS 23 52 30.01 10 CENTRAL COAL-FIRED STEAM-GENERATING SYSTEM, and UFGS 23 52 30.02 10.CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL FIRED |
| Aug-2026 |
A
|
UFGS 23 52 30.00 10 Heat Recovery Boilers |
May-2020 |
D
|
|
Superseded by UFGS 23 52 30 HEAT RECOVERY BOILERS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
A
|
UFGS 23 52 30.01 10 Central Coal-Fired Steam-Generating System |
May-2020 |
D
|
|
Superseded by UFGS 23 52 30 HEAT RECOVERY BOILERS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
A
|
UFGS 23 52 30.02 10 Central Steam Generating System - Combination Gas and Oil Fired |
May-2020 |
D
|
|
Superseded by UFGS 23 52 30 HEAT RECOVERY BOILERS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
N
|
UFGS 23 52 33.01 20 Steam Heating Plant Watertube (Shop Assembled) Coal/Oil or Coal |
Nov-2008 |
D
|
|
Superseded by UFGS-STEAM HEATING PLANT WATERTUBE COAL/OIL OR COAL.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
N
|
UFGS 23 52 33.01 Steam Heating Plant Watertube Coal/Oil or Coal |
Aug-2026 |
N
|
|
New unified Section superseding UFGS-23 52 33.01 20 STEAM HEATING PLANT WATERTUBE (SHOP ASSEMBLED) COAL/OIL OR COAL |
| Aug-2026 |
N
|
UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal |
Nov-2008 |
D
|
|
Superseded by UFGS-23 52 33.02 CENTRAL STEAM GENERATING SYSTEM -COMBINATION GAS AND OIL-FIRED.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
N
|
UFGS 23 52 33.02 Central Steam Generating System - Combination Gas and Oil-Fired |
Aug-2026 |
N
|
|
New unified Section superseding UFGS-23 52 33.02 20 STEAM HEATING PLANT WATERTUBE (FIELD ERECTED) COAL/OIL OR COAL and UFGS-23 52 33.03 20 WATER-TUBE BOILERS, OIL/GAS OR OIL |
| Aug-2026 |
N
|
UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil |
Nov-2008 |
D
|
|
Superseded by UFGS-23 52 33.02 CENTRAL STEAM GENERATING SYSTEM -COMBINATION GAS AND OIL-FIRED.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
N
|
UFGS 23 52 43.00 20 Low Pressure Water Heating Boilers (Under 800,000 Btu/hr Output) |
May-2015 |
D
|
|
Superseded by UFGS-23 52 00.01 LOW PRESSURE (<260 PSIG) WATER HEATING BOILERS (UNDER 6,000,000 BTU/HR INPUT).Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
N
|
UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 Btu/hr Output) |
May-2015 |
D
|
|
Superseded by UFGS-23 52 00.02 LOW PRESSURE (<260 PSIG) WATER HEATING BOILERS (OVER 6,000,000 BTU/HR INPUT).Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
N
|
UFGS 23 52 49.00 20 Steam Boilers and Equipment (500,000 - 18,000,000 Btu/hr) |
Nov-2008 |
D
|
|
Superseded by UFGS-23 52 00.03 STEAM BOILERS AND EQUIPMENT (400,000 -6,000,000 BTU/HR INPUT).Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
N
|
UFGS 23 52 53.00 20 Steam Boilers and Equipment (18,000,000 - 60,000,000 Btu/hr) |
May-2018 |
D
|
|
Superseded by UFGS-23 52 00.04 STEAM BOILERS AND EQUIPMENT (OVER 6,000,000 BTU/HR) INPUT.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
A
|
UFGS 32 01 16.70 Cold-Mix Reused Asphalt Paving |
May-2018 |
D
|
|
Superseded by UFGS 32 12 16.19 COLD-MIX ASPHALT PAVING.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2026 |
A
|
UFGS 32 12 16.19 Cold-Mix Asphalt Paving |
Aug-2026 |
R
|
|
Complete review and update. Superseding UFGS 32 01 16.70 COLD-MIX REUSED ASPHALT PAVING |
| Aug-2026 |
N
|
UFGS 33 05 23 Trenchless Utility Installation |
Aug-2015 |
C
|
3 |
In response to CCR 13594, updated SD-01 Preconstruction Submittals in the SUBMITTALS Article and updated section text to coordinate with the changes; updated paragraphs Statement of Contractor Qualifications (1.5.1) and Microtunneling Plan or Boring and Jacking Plan (1.8.1); modified Record Drawings and Dailly Work Logs paragraph (3.6.3). |
| Aug-2026 |
A
|
UFGS 33 61 13.13 Prefabricated Underground Hydronic Energy Distribution |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 33 61 13.19 Valves, Piping, and Equipment in Valve Manholes |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
N
|
UFGS 33 61 14 Exterior Buried Preinsulated Water Piping |
Aug-2026 |
R
|
|
Complete review and update. |
| Aug-2026 |
A
|
UFGS 33 63 13.19 Concrete Trench Hydronic and Steam Energy Distribution |
Aug-2026 |
R
|
|
Complete review and update. |
| May-2026 |
N
|
UFGS 01 11 00 Summary of Work |
Feb-2024 |
C
|
2 |
In response to CCR 17030, updated paragraph "Location of Underground Utilities" (1.5) to verify utility locations within the area of work. |
| May-2026 |
N
|
UFGS 01 78 23 Operation and Maintenance Data |
May-2023 |
C
|
3 |
In response to CCR 17227, changed "Record Drawings and Utility Systems" to "Utility Systems" in Submittals and as paragraph title for 1.6.6.7; also updated paragraph 1.6.6.7. |
| May-2026 |
N
|
UFGS 08 39 55.00 20 Navy Standard Earth-Covered Magazine Doors |
Nov-2024 |
C
|
1 |
Removed shop coating requirement for Navy ECM blast doors from paragraph Finishes (2.6). |
| May-2026 |
N
|
UFGS 08 56 46.10 20 Radio Frequency Shielded Enclosures, Demountable Type |
Aug-2011 |
D
|
|
Superseded by UFGS-13 49 33.70 TEMPEST [DEMOUNTABLE] [TRANSPORTABLE] [MODULAR] RADIO FREQUENCY INTERFERENCE (RFI) SHIELDED ENCLOSURE.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2026 |
N
|
UFGS 09 97 13.15 20 Low VOC Flexible Interior Coating of Steel Fuel Tanks |
May-2026 |
N
|
|
This section has been renumbered and posted as new - for NAVY USE ONLY |
| May-2026 |
N
|
UFGS 13 49 20 Radio Frequency (RF) Shielding |
May-2026 |
N
|
|
New unified section for radio frequency (RF) shielding of fixed facilities; Superseding UFGS-13 49 20.00 10 RFI/EMI SHIELDING. |
| May-2026 |
A
|
UFGS 13 49 20.00 10 RFI/EMI Shielding |
Oct-2007 |
D
|
|
Superseded by UFGS-13 49 20 RADIO FREQUENCY (RF) SHIELDING and UFGS-13 49 30 HIGH-ALTITUDE ELECTROMAGNETIC PULSE (HEMP) SHIELDING.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2026 |
N
|
UFGS 13 49 30 High-Altitude Electromagnetic Pulse (HEMP) Shielding |
May-2026 |
N
|
|
New unified section superseding UFGS-13 49 20.00 10 RFI/EMI SHIELDING. |
| May-2026 |
N
|
UFGS 13 49 33.70 Tempest [Demountable] [Transportable] [Modular] Radio Frequency Interference (RFI) Shielded Enclosure |
May-2026 |
N
|
|
New unified section superseding UFGS-08 56 46.10 20 RADIO FREQUENCY SHIELDED ENCLOSURES, DEMOUNTABLE TYPE. |
| May-2026 |
N
|
UFGS 23 51 43.00 20 Dust and Gas Collector, Dry Scrubber and Fabric Filter Type |
Feb-2010 |
D
|
|
Archived with no replacement; specification obsolete/low usage.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2026 |
N
|
UFGS 23 51 43.01 20 Mechanical Cyclone Dust Collector of Flue Gas Particulates |
Apr-2006 |
D
|
|
Archived with no replacement; specification obsolete/low usage.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2026 |
N
|
UFGS 23 51 43.02 20 Electrostatic Dust Collector of Flue Gas Particulates |
Apr-2006 |
D
|
|
Archived with no replacement; specification obsolete/low usage.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2026 |
N
|
UFGS 23 51 43.03 20 Fabric Filter Dust Collector of Fly Ash Particles in Flue Gas |
Feb-2010 |
D
|
|
Archived with no replacement; specification obsolete/low usage.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2026 |
N
|
UFGS 23 52 33.01 20 Steam Heating Plant Watertube (Shop Assembled) Coal/Oil or Coal |
Nov-2008 |
C
|
4 |
In response to archived UFGS sections referenced in this section, the note and text for paragraph AIR POLLUTION CONTROL EQUIPMENT (2.13) were updated. |
| May-2026 |
N
|
UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal |
Nov-2008 |
C
|
6 |
In response to archived UFGS sections referenced in this section, the note and text for paragraphs AIR POLLUTION CONTROL EQUIPMENT (2.13) and Scrubbers (2.13.1) were updated. |
| May-2026 |
N
|
UFGS 23 69 00.00 20 Refrigeration Equipment for Cold Storage |
Jul-2006 |
D
|
|
Superseded by UFGS-23 63 00.00 Cold Storage Refrigeration Systems.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2026 |
N
|
UFGS 26 41 00 Lightning Protection System |
May-2026 |
R
|
|
Complete review and update. |
| May-2026 |
A
|
UFGS 31 33 40 Foundation Drilling and Grouting in Rock through Concrete Structures |
May-2026 |
N
|
|
New Section superseding UFGS-31 43 13.13 CONCRETE PRESSURE GROUTING. |
| May-2026 |
A
|
UFGS 31 43 13.13 Concrete Pressure Grouting |
Feb-2021 |
D
|
|
Superseded by UFGS 31 33 40 FOUNDATION DRILLING AND GROUTING IN ROCK THROUGH CONCRETE STRUCTURES.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2026 |
N
|
UFGS 33 71 02 Underground Electrical Distribution |
Feb-2026 |
C
|
1 |
Updated content of "Construction" paragraph (2.14.2.3); updated "Joints" paragraph (2.14.2.4) to include shiplap. |
| May-2026 |
A
|
UFGS 34 11 00 Rail Tracks |
May-2026 |
R
|
|
Complete review and update, to include title change from RAILROAD TRACK AND ACCESSORIES to RAIL TRACKS |
| May-2026 |
N
|
UFGS 41 22 13.16 Gantry Cranes |
Apr-2008 |
D
|
|
Archived; For more information, contact Navy Crane CenterSee also NAVCRANECENINST 11450.1D of 14 August 2025Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2026 |
N
|
UFGS 41 22 13.19 Jib Cranes |
May-2025 |
C
|
1 |
Large update with numerous terminology adjustments, document reorganization, and formatting tweaks to ensure alignment with associated equipment specifications. |
| May-2026 |
N
|
UFGS 41 22 13.55 Bridge Cranes, Aircraft Maintenance Hangar |
Nov-2025 |
C
|
1 |
Minor terminology adjustments and formatting tweaks to ensure alignment with associated equipment specifications. |
| May-2026 |
N
|
UFGS 41 22 23.19 Monorail Hoists |
May-2025 |
C
|
1 |
Large update with numerous terminology adjustments, document reorganization, and formatting tweaks to ensure alignment with associated equipment specifications. |
| May-2026 |
N
|
UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators |
Feb-2011 |
D
|
|
Section has been Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Feb-2026 |
A
|
UFGS 03 70 00 Mass Concrete |
Feb-2026 |
R
|
|
Complete review and update. |
| Feb-2026 |
N
|
UFGS 07 56 00.60 Mesh Reinforced Elastomeric Coating (MREC) Roofing |
Aug-2025 |
C
|
1 |
In response to CCR 17084, updated Base and Intermediate Coat and Fabric Components (3.4.2) to clarify that manufacturer's instructions should be followed for the specific roof type to which the membrane is being applied. |
| Feb-2026 |
A
|
UFGS 08 33 23 Overhead Coiling Doors |
Aug-2020 |
C
|
2 |
Incorporated various CCRs. |
| Feb-2026 |
N
|
UFGS 13 31 33 Frame Supported Membrane Structures for Protection of Aircraft |
Feb-2023 |
D
|
|
Superseded by UFGS-13 31 34 FRAME SUPPORTED MEMBRANE STRUCTURES FOR AIRCRAFT HANGARS OR PROTECTION OF AIRCRAFT.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Feb-2026 |
N
|
UFGS 13 31 34 Frame Supported Membrane Structures for Aircraft Hangars or Protection of Aircraft |
Feb-2026 |
N
|
|
New UFGS to address frame supported membrane structures for use on airfields for either an aircraft hangar or for protection of aircraft (weather, sunshade, environmental shelter). This section supersedes UFGS-13 31 33 FRAME SUPPORTED MEMBRANE STRUCTURES FOR PROTECTION OF AIRCRAFT. |
| Feb-2026 |
N
|
UFGS 13 50 00 Ignitable Liquid Drainage Floor Assemblies |
Feb-2026 |
N
|
|
New UFGS Section to address ignitable liquid drainage floor assemblies, including their peripheral equipment and controls. |
| Feb-2026 |
A
|
UFGS 26 05 19.00 10 Insulated Wire and Cable |
Feb-2026 |
R
|
|
Updated to incorporate various CCRs. |
| Feb-2026 |
N
|
UFGS 26 05 33 Dockside Power Connection Stations |
Feb-2026 |
R
|
|
Updated to incorporate various CCRs. |
| Feb-2026 |
N
|
UFGS 26 11 13.00 20 Primary Unit Substation |
Feb-2026 |
R
|
|
Updated to incorporate various CCRs. |
| Feb-2026 |
A
|
UFGS 26 11 14.00 10 Main Electric Supply Station and Substation |
Feb-2026 |
R
|
|
Updated to incorporate various CCRs. |
| Feb-2026 |
N
|
UFGS 26 13 13 Metal-Clad Switchgear |
Feb-2026 |
R
|
|
Updated to incorporate various CCRs. |
| Feb-2026 |
N
|
UFGS 26 20 00 Interior Distribution System |
May-2025 |
C
|
2 |
In response to several CCRs, updates have been made to paragraphs Conductors (2.7.1) and Motors (2.17); also CCR 17516, MET/ENG tags have been added to conductor sizes throughout the section. |
| Feb-2026 |
A
|
UFGS 26 28 00.00 10 Motor Control Centers, Switchboards and Panelboards |
Feb-2026 |
R
|
|
Updated to incorporate various CCRs. |
| Feb-2026 |
N
|
UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts |
Feb-2026 |
R
|
|
Updated to incorporate various CCRs. |
| Feb-2026 |
N
|
UFGS 26 31 00 Facility-Scale Solar Photovoltaic (PV) Systems |
Feb-2026 |
R
|
|
Updated to incorporate various CCRs. |
| Feb-2026 |
A
|
UFGS 26 32 15 Engine-Generator Set Stationary 15-2500 kW, with Auxiliaries |
Feb-2026 |
R
|
|
Updated to incorporate various CCRs. |