Status
Retired / Superseded
Publish Date
Archived / Rescinded Date
Change Notice
Superseded by UFGS-23 52 00.02 LOW PRESSURE (<260 PSIG) WATER HEATING BOILERS (OVER 6,000,000 BTU/HR INPUT)
Division
23 - Heating, Ventilating, and Air Conditioning

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2026 N D

Superseded by UFGS-23 52 00.02 LOW PRESSURE (<260 PSIG) WATER HEATING BOILERS (OVER 6,000,000 BTU/HR INPUT).

Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.

Aug-2018 N C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
May-2016 N C 2 CCR 4532: revised use of "shall" and imperative language
Aug-2015 N C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
May-2015 N R Revised throughout to incorporate CCRs 1007 and 4266. Modifications included references, boiler installation requirements, detail drawings, water analysis, safety standards, submittals, controls, safety features, operational tests, and acceptance operational test and inspection.