Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Aug-2023 A UFGS 05 14 00.13 Welding Structural Aluminum Framing C 1 Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 S UFGS 05 51 00 Metal Stairs R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 5458, 7328, 11237
Aug-2023 S UFGS 05 52 00 Metal Railings R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 11143
Aug-2023 S UFGS 05 72 00 Decorative Metal Specialties R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 06 18 00 Glued-Laminated Construction R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 10243
Aug-2023 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 N UFGS 07 11 13 Bituminous Dampproofing R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 14 00 Fluid-Applied Waterproofing R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 16 19 Metallic Oxide Waterproofing R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 19 00 Water Repellents R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 21 13 Board and Block Insulation R Complete review and update
Aug-2023 N UFGS 07 21 16 Mineral Fiber Blanket Insulation R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 21 23 Loose Fill Thermal Insulation R Complete review and update
Aug-2023 N UFGS 07 22 00 Roof and Deck Insulation R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 24 00 Exterior Insulation and Finish Systems R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 27 10 Building Air Barrier System N Superseding UFGS 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM. Complete review and update, to include section number chage (unification). Incorporated CCRs #5650, 9348, 12613
Aug-2023 A UFGS 07 27 10.00 10 Building Air Barrier System D Superseded by UFGS 07 27 10 BUILDING AIR BARRIER SYSTEM.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 07 27 19.01 Self-Adhering Air Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 27 26 Fluid-Applied Membrane Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 27 36 Spray Foam Air Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 54 19 Polyvinyl Chloride Roofing R Complete review and update.
Aug-2023 N UFGS 07 60 00 Flashing and Sheet Metal R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 72 20 Gravity-Type Roof Ventilators R Complete review and update.
Aug-2023 N UFGS 07 92 00 Joint Sealants R Complete review and update including the incorporation of CCRs.
Aug-2023 S UFGS 12 48 13 Entrance Floor Mats and Frames R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 N UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 N UFGS 23 01 30.41 HVAC System Cleaning C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 N UFGS 23 05 15 Common Piping for HVAC C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 A UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems C 1 Incorporated various CCRs.
Aug-2023 S UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 26 05 73 Power System Studies N Superseding UFGS 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION. New UFGS section.
Aug-2023 N UFGS 26 20 00 Interior Distribution System R Complete review and update to incorporate CCRs
Aug-2023 A UFGS 26 28 01.00 10 Coordinated Power System Protection D Superseded by UFGS 26 05 73 POWER SYSTEM STUDIES.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 S UFGS 26 28 21.00 40 Automatic Transfer Switches R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 9563
Aug-2023 N UFGS 26 41 00 Lightning Protection System R Complete review and update based on CCRs and age of the document.
Aug-2023 S UFGS 26 52 00.00 40 Emergency Lighting R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 26 53 00.00 40 Exit Signs R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 5180, 7562
Aug-2023 S UFGS 26 55 53 Security Lighting R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 27 05 28.36 40 Cable Trays for Communications Systems R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 28 08 10 Electronic Security System Acceptance Testing R Complete review and update.
Aug-2023 N UFGS 28 31 02.00 20 Fire Alarm Reporting Systems - Digital Communicators D Superseded by 28 31 32 FIRE ALARM REPORTING SYSTEM, DIGITAL COMMUNICATOR TYPE
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 28 31 32 Fire Alarm Reporting System, Digital Communicator Type N Superseding UFGS 28 31 02.00 20 COORDINATED POWER SYSTEM PROTECTION and UFGS 28 31 75.00 10 CENTRAL FIRE ALARM SYSTEM, DIGITAL ALARM COMMUNICATOR TYPE. New UFGS section.
Aug-2023 A UFGS 28 31 33 Fire Alarm Reporting System, Radio Type N Superseding UFGS 28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE and UFGS 28 31 33.13 20 EXTERIOR FIRE REPORTING SYSTEM, RADIO TYPE. New UFGS section.
Aug-2023 A UFGS 28 31 33.00 10 Fire Alarm Reporting System, Radio Type D Superseded by UFGS 28 31 33 FIRE ALARM REPORTING SYSTEM, RADIO TYPE.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 28 31 33.13 20 Exterior Fire Reporting System, Radio Type D Superseded by 28 31 33 FIRE ALARM REPORTING SYSTEM, RADIO TYPE
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 28 31 73.00 20 Exterior Fire Alarm System, Closed Circuit Telegraphic Type D Section has been Archived with no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 28 31 75.00 10 Central Fire Alarm System, Digital Alarm Communicator Type D Superseded by UFGS 28 31 32 FIRE ALARM REPORTING SYSTEM, DIGITAL COMMUNICATOR TYPE.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 31 00 00 Earthwork R Superseding UFGS 31 23 00.00 20 EXCAVATION AND FILL. Complete review and update.
Aug-2023 N UFGS 31 23 00.00 20 Excavation and Fill D Superseded by 31 00 00 EARTHWORK
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 32 13 14.14 Concrete Paving for Small Airfield Projects N New UFGS Section.
Aug-2023 S UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 1 Incorporated various CCRs
Aug-2023 A UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type C 3 Incorporated various CCRs
May-2023 N UFGS 01 78 23 Operation and Maintenance Data R Revised throughout to unify Army and Navy requirements of Operation and Maintenance Manuals that were previously in this Section and in UFGS-01 78 24.00 10 and UFGS-01 78 24.00 20. Incorporated industry standards for the Operation and Maintenance Manual organization.
May-2023 A UFGS 01 78 24.00 10 Facility Data Requirements R Non-technical revision to update the Target Refresh Date.
May-2023 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) R Removed Operation and Maintenance Manual requirements throughout, this content has been incorporated into UFGS 01 78 23. Only Facility Data Workbook requirements remain in this section. Section Title changed from FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI) to FACILITY DATA WORKBOOK (FDW).
May-2023 A UFGS 01 91 00.15 10 Total Building Commissioning D Section Archived; 01 91 00.15 10 has been superseded by Unified Section UFGS-01 91 00.15 BUILDING COMMISSIONING
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 N UFGS 01 91 00.15 20 Total Building Commissioning D Superseded by unified UFGS-01 91 00.15 BUILDING COMMISSIONING.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 N UFGS 01 91 00.15 Building Commissioning N Section number has been reinstated with the unification of Army and Navy Commissioning Sections. This new version supersedes UFGS-01 91 00.15 10 and UFGS-01 91 00.15 20 TOTAL BUILDING COMMISSIONING. Title has been changed to BUILDING COMMISSIONING.
May-2023 A UFGS 01 91 19 Building Enclosure Commissioning N New UFGS section superseding UFGS 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS.
May-2023 A UFGS 02 42 51 Carpet Removal and Reclamation C 1 Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness D Superseded by UFGS 01 91 19 BUILDING ENCLOSURE COMMISSIONING.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 07 41 63 Fabricated Roof Panel Assemblies C 1 Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 N UFGS 08 11 69 Metal Storm Doors D Section has been archived with no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames C 1 Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 08 33 23 Overhead Coiling Doors C 1 Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 08 34 73 Sound Control Door Assemblies C 1 Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 N UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
May-2023 A UFGS 09 23 82 Fireproof Gypsum Plastering C 1 Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 67 23.13 Standard Resinous Flooring C 1 Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 96 00 High-Performance Coatings C 1 Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 N UFGS 10 44 16 Fire Extinguishers C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
May-2023 N UFGS 23 08 00 Commissioning of Mechanical[ and Plumbing] Systems N Unified Section superseding UFGS-23 08 00.00 20 COMMISSIONING OF MECHANICAL[ AND PLUMBING] SYSTEMS.
May-2023 N UFGS 23 08 00.00 20 Commissioning of Mechanical[ and Plumbing] Systems D Superseded by unified UFGS-23 08 00 COMMISSIONING OF MECHANICAL[ AND PLUMBING] SYSTEMS.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 S UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers R Complete life cycle review. Updated technical requirements, references, formatting.
May-2023 S UFGS 26 56 13.00 40 Lighting Poles and Standards R Complete life cycle review. Updated technical requirements, references, formatting.
May-2023 S UFGS 26 56 13.00 40 Lighting Poles and Standards R Complete life cycle review. Updated technical requirements, references, formatting.
May-2023 A UFGS 31 41 16.16 Synthetic Sheet Piling N New UFGS section.
May-2023 A UFGS 31 63 29 Drilled Concrete Piers and Shafts C 1 Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 S UFGS 33 75 00.00 40 Switchgear and Protection Devices D Archived. No longer used.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams C 3 Incorporated CCR 13056
Feb-2023 N UFGS 01 14 00 Work Restrictions C 1 In response to CCR 12429, updated work requirements at Naval Base Kitsap.
Feb-2023 N UFGS 01 20 00 Price and Payment Procedures C 3 In response to CCR 12177, replaced "lump sum" with "Job" in second Note for Army projects, removed "lump sum" from DREDGING paragraph (1.11).
Feb-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 8 In response to CCR 12594, updated ECMS UTILIZATION paragraph (1.6) to clarify when contractors must utilize eCMS for transferring submittals.
Feb-2023 A UFGS 01 33 00 Submittal Procedures C 1 Administrative Change: Preparing Activity changed from NASA to Army.
Feb-2023 N UFGS 07 27 36 Spray Foam Air Barriers C 3 In response to CCR 12503, updated SUBMITTALS article and Prohibited Materials paragraph (2.1.5) to disallow all HFC blowing agents.
Feb-2023 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing C 4 In response to CCR 12504, updated SUBMITTALS article and SPRAY URETHANE FOAM paragraph (2.2) to disallow all HFC blowing agents.
Feb-2023 N UFGS 12 00 01.00 20 Furniture, Fixtures and Equipment (FF&E) Package N New section developed for the design, procurement and installation of furniture, fixtures and equipment (FF&E) for new construction and building renovation projects.
Feb-2023 N UFGS 13 31 33 Frame Supported Membrane Structures for Protection of Aircraft N New section for frame supported membrane structures on airfields, which are commonly referred to as Aircraft Protective Equipment or Sunshades.
Feb-2023 S UFGS 22 07 19.00 40 Plumbing Piping Insulation R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCRs 5805 and 11444
Feb-2023 A UFGS 22 14 29.00 Sump Pumps R Complete review and update including Section number change from UFGS-22 14 29.00 40 to UFGS-22 14 29.00; Preparing Activity changed from NASA to Army.
Feb-2023 S UFGS 22 66 53.00 40 Laboratory Chemical-Waste and Vent Piping R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 23 22 23.00 40 Steam Condensate Pumps R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 23 41 13.00 40 Panel Filters R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 27 13 23.00 40 Communications Optical Backbone Cabling R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCRs 4556, 11315, 11317, 11956
Feb-2023 S UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 A UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications R Complete review and update.
Feb-2023 S UFGS 33 71 01.00 40 Overhead Transmission and Distribution R Complete life cycle review. Update technical requirements, references, formatting.