Export to CSV

Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
May-2017 A UFGS 10 14 53 Traffic Signage C 1 In response to CCR 4523, updated references and incorporated minor changes.
May-2017 S UFGS 22 14 29.00 Sump Pumps R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 74 33.00 40 Small HVAC Units, Cooling-Only, Recirculating, Split and Unitary for Window and Floor Mounting R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 82 19.00 40 Fan Coil Units R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 82 19.00 40 Fan Coil Units R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 82 23.00 40 Unit Ventilators R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 82 23.00 40 Unit Ventilators R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 23 82 43.00 40 Electric Duct Heaters R Tri-Annual Database Maintenance (TADM) completed
May-2017 N UFGS 23 82 46.00 40 Electric Unit Heaters R Tri-Annual Database Maintenance (TADM) completed
May-2017 N UFGS 25 50 00.00 20 Cybersecurity of Facility-Related Control Systems C 1 Clarified contractor requirements throughout. Revised the subparagraphs of 1.2.4 to remove requirements to be performed by the Government and to clarify the Contractor's requirements. CCR 5584: Revised 1.2 and 3.1 to read QUALITY CONTROL and FIELD QUALITY CONTROL, respectively. CCR 5629: Clarified 1.2.1 and 1.2.2 to provide submittal via Registered Mail.
May-2017 N UFGS 26 12 19 Pad-Mounted, Liquid-Filled, Medium Voltage Transformers R Revision included updating the minimum efficiency to meet 10 CFR 431, Subpart K, and meeting additional changes in transformer technology.
May-2017 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers R Revision included updating the minimum efficiency to meet 10 CFR 431, Subpart K, and meeting additional changes in transformer technology.
May-2017 S UFGS 26 28 21.00 40 Automatic Transfer Switches R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 27 05 28.36 40 Cable Trays for Communications Systems R Tri-Annual Database Maintenance (TADM) completed
May-2017 N UFGS 31 31 16.19 Termite Control Barriers C 1 Changes made to include a note for Air Force to use Chemical Termite Control and deleting reference to ASTM C289 in response to CCR 4978.
May-2017 A UFGS 32 01 13 Bituminous Seal and Fog Coats D Superseded by UFGS 32 12 36.13 Asphaltic Seal and Fog Coats.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2017 A UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements D Superseded by UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2017 A UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving N Superseding UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements; Total review and update.
May-2017 A UFGS 32 01 18.71 Grooving of Airfield Paving N Superseding UFGS 32 01 26.71 Grooving for Airfield Pavements; Total review and update.
May-2017 A UFGS 32 01 26.71 Grooving for Airfield Pavements D Superseded by UFGS 32 01 18.71 Grooving of Airfield Paving.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2017 A UFGS 32 01 29.61 Partial Depth Patching of Rigid Paving R Total review and update.
May-2017 A UFGS 32 01 29.62 Concrete Pavement Raising C 1 In response to CCR 2107, changed section title for compliance to the MasterFormat 2011 update.
May-2017 N UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement D Pervious Bituminous Concrete Pavement lacks an acceptable industry standard and the majority of Installations do not have acceptable maintenance practices in place to perform required maintenance.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2017 A UFGS 32 12 10 Bituminous Tack and Prime Coats D Superseded by UFGS 32 12 13 with same title.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2017 A UFGS 32 12 13 Bituminous Tack[ and][ Prime] Coats N Superseding UFGS 32 12 10; Total review and update with no title change.
May-2017 A UFGS 32 12 36.13 Bituminous Fog Seal N Superseding UFGS 32 01 13 Bituminous Seal and Fog Coats; Total review and update.
May-2017 A UFGS 32 15 00 Aggregate Surfacing R Total review and update; Section title changed from Aggregate Surface Course.
May-2017 A UFGS 32 17 23 Pavement Markings C 2 In response to CCR 5549, removed "Gradation A" from Type III beads.
May-2017 S UFGS 32 31 13 Chain Link Fences and Gates C 1 Incorporated CCR 4487, revised paragraphs 2.2.15, and 2.2.17
May-2017 N UFGS 32 84 24 Irrigation Sprinkler Systems C 1 Changes made to address CCRs 5293, 5294, 5305, 5306, and 5307
May-2017 A UFGS 33 40 00 Stormwater Utilities C 5 Added requirements for field quality control.
May-2017 S UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses R Tri-Annual Database Maintenance (TADM) completed
May-2017 A UFGS 34 71 13.16 Vehicle Crash Barriers C 1 In response to CCR 4568, updated references and incorporated minor changes.
May-2017 S UFGS 40 18 00.00 40 Vacuum Systems Process Piping R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 40 18 00.00 40 Vacuum Systems Process Piping R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 42 22 00.00 40 Process Chillers and Coolers R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 42 22 00.00 40 Process Chillers and Coolers R Tri-Annual Database Maintenance (TADM) completed
May-2017 F UFGS 48 14 00 Solar Photovoltaic Systems N New Section.
May-2017 N UFGS 48 15 00 Wind Generator System N New Section.
May-2017 A UFGS 48 16 00 Landfill Gas Systems N New Section.
Feb-2017 N UFGS 01 33 29 Sustainability Requirements and Reporting R Required revisions in order to align with numerous changes in Federal requirements and DOD policy.
Feb-2017 N UFGS 01 35 26 Governmental Safety Requirements C 4 Added crane requirements for Critical Lift Plan, Barge Mounted, and Base Mounted Drum Hoists from NAVFAC P-307 that were not in EM 385-1-1. For Navy, added requirement of accident investigation reporting within 5 days of mishaps and 10 days of accidents.
Feb-2017 S UFGS 01 75 00.00 40 Starting and Adjusting D This Section has been retired / Action Item from the Fall 2016 Specification DWG Meeting.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 A UFGS 01 91 00.15 Building Commissioning C 1 In response to CCR 5173, added two "S" submittals in SD-11.
Feb-2017 A UFGS 02 53 13 Remediation of Contaminated Soils and Sludges by Incineration D UFGS archived. Outdated specification and no longer use incineration for contaminated soils.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 N UFGS 02 83 13.00 20 Lead in Construction C 1 CCR 5279: updated paragraph 1.5.2.2 Lead Compliance Plan.
Feb-2017 S UFGS 05 51 00 Metal Stairs R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 05 51 00 Metal Stairs R Tri-Annual Database Maintenance - Subpart 1.2 Submittal Article Compliance
Feb-2017 N UFGS 07 22 00 Roof and Deck Insulation C 1 CCR 5475: Changed terminology within this section from “Protection Board” to “Cover Board”.
Feb-2017 S UFGS 23 09 13.34 40 Control Valves, Self-Contained R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 N UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC C 1 BACnet Operator Workstation (B-OWS) updated to BACnet Advanced Operator Workstation (B-AWS) in 2.1.6.2-[BACnet Operator Workstation][and][Notebook Computer] DDC Software.
Feb-2017 S UFGS 23 22 13.35 40 Steam Traps R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 23 34 23.00 40 HVAC Power Ventilators R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 23 34 23.00 40 HVAC Power Ventilators R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 4 Updated Technical Note in 2.2.2-Fittings and End Connections (Joints)
Feb-2017 N UFGS 25 50 00.00 20 Cybersecurity of Facility-Related Control Systems N New Navy-only Section identifying the requirements for a NAVFAC Cybersecurity Hygiene Checklist.
Feb-2017 S UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 A UFGS 32 01 13.64 Rejuvenation of Asphalt Pavement Surfaces N Superseding UFGS 32 01 22 Bituminous Rejuvenation; Total review and update.
Feb-2017 A UFGS 32 01 16.17 Cold Milling of Bituminous Pavements D Superseded by UFGS 32 01 16.71 Cold Milling Asphalt Paving.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 A UFGS 32 01 16.71 Cold Milling Asphalt Paving N Superseding UFGS 32 01 16.17 Cold Milling of Bituminous Pavements; Total review and update.
Feb-2017 A UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving N Superseding UFGS 32 01 25 Heater Scarifying of Bituminous Pavements; Total review and update.
Feb-2017 A UFGS 32 01 22 Bituminous Rejuvenation D Superseded by UFGS 32 01 13.64 Bituminous Pavement Liquid Rejuvenating
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 A UFGS 32 01 25 Heater Scarifying of Bituminous Pavements D Superseded by UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 A UFGS 32 17 23 Pavement Markings C 1 In response to CCR 5270, changed "Waterborne Paint" to "Reflective Media for Airfields" in SD-07.
Feb-2017 N UFGS 32 93 00 Exterior Plants C 2 CCR 4981: References to ASTM D5203 and ASTM D5852 have been removed from this Section.
Feb-2017 A UFGS 33 46 16 Subdrainage Piping R Total review and update including title change from
SUBDRAINAGE SYSTEM
Feb-2017 S UFGS 33 71 01.00 40 Overhead Transmission and Distribution C 1 Changed 3 tailoring tags; corrected minor discrepancies
Nov-2016 S UFGS 01 33 00 Submittal Procedures C 9 Replaced 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) with 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) in Subpart 1.9 SUBMITTAL REGISTER AND DATABASE.
Nov-2016 N UFGS 01 35 26 Governmental Safety Requirements C 3 In paragraph "Fall Protection for Roofing Work", item b. Steep-Sloped Roofs, changed slope from "4:1" to "4:12".
Nov-2016 A UFGS 01 45 00.00 10 Quality Control R Total review and update.
Nov-2016 A UFGS 01 45 00.10 10 Quality Control System (QCS) D Superseded by UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM).
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2016 A UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) N Superseding UFGS 01 45 00.10 10 Quality Control System (QCS); Total review and update.
Nov-2016 A UFGS 02 83 19.00 10 Lead Based Paint Hazard Abatement, Target Housing and Child Occupied Facilities D Superseded by UFGS 02 83 19.13 10 Lead-Based Paint Abatement; Nontechnical number and title change.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2016 A UFGS 02 83 19.13 10 Lead-Based Paint Abatement R Superseding UFGS 02 83 19.00 10 Lead Based Pain Hazard Abatement, Target Housing and Child Occupied Facilities; Nontechnical Number and Title Revision; Did not change Section date.
Nov-2016 N UFGS 06 13 33 Pier Timberwork R Revised to address changes in preservative treatments for Pier Timberwork.
Nov-2016 A UFGS 06 17 19 Cross-Laminated Timber N New Section
Nov-2016 N UFGS 07 31 13 Asphalt Shingles C 1 In response to CCR #5002, added reference to ASTM D7158/D7158M for Class H roof in paragraph 2.2.1 "Shingles."
Nov-2016 A UFGS 09 06 00 Schedules for Finishes R Superseding UFGS 09 06 90 Schedules for Painting and Coating; Nontechnical Number and Title Revision; Did not change Section date.
Nov-2016 A UFGS 09 06 90 Schedules for Painting and Coating D Superseded by UFGS 09 06 00 Schedules for Finishes; Nontechnical number and title change.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2016 A UFGS 09 65 00 Resilient Flooring C 2 In response to CCR 4916, Luxury Vinyl Tile added.
Nov-2016 N UFGS 09 97 23.17 Corrosion Inhibitor Coating of Concrete Structures C 1 Paragraphs "Penetrating Vapor Phase Corrosion Inhibitor" and "Surface Sealant' were revised to correct the product technical descriptions.
Nov-2016 S UFGS 12 31 00 Manufactured Metal Casework C 2 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.8 COLOR, TEXTURE, AND PATTERN.
Nov-2016 S UFGS 12 34 00 Manufactured Plastic Casework C 2 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern.
Nov-2016 S UFGS 12 36 00 Countertops C 1 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern.
Nov-2016 S UFGS 12 48 13 Entrance Floor Mats and Frames C 3 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.4 COLOR AND SIZE.
Nov-2016 S UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures R Tri-Annual Database Maintenance (TADM) completed
Nov-2016 N UFGS 23 64 00 Packaged Water Chillers, Absorption Type R Complete revision.
Nov-2016 N UFGS 23 64 10 Water Chillers, Vapor Compression Type R Complete revision.
Nov-2016 N UFGS 23 65 00 Cooling Towers and Remote Evaporatively-Cooled Condensers R Title changed from Cooling Towers; Complete review and update concerning cooling towers and remote evaporatively cooled condensers.
Nov-2016 N UFGS 26 51 00 Interior Lighting C 1 Changed LED light fixtures, light sources and drivers to a 5 year warranty to meet current industry standards.
Nov-2016 A UFGS 31 11 00 Clearing and Grubbing C 1 Added herbicide requirements.
Nov-2016 N UFGS 31 62 19.13 Timber Marine Piles R Title changed from Wood Marine Piles; Revised to address changes in preservative treatments and basis of bids for Timber Marine Piles.
Nov-2016 A UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements C 1 Clarified sandblasting requirements.
Nov-2016 S UFGS 32 31 13 Chain Link Fences and Gates R Tri-Annual Database Maintenance (TADM) completed