Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
| KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
|---|---|---|---|---|---|
| ACTION | N New | R Revision | C Change | D Deletion |
| Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
|---|---|---|---|---|---|---|
| May-2017 | A | UFGS 10 14 53 Traffic Signage | Feb-2015 | C | 1 | In response to CCR 4523, updated references and incorporated minor changes. |
| May-2017 | S | UFGS 22 14 29.00 Sump Pumps | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 74 33.00 40 Small HVAC Units, Cooling-Only, Recirculating, Split and Unitary for Window and Floor Mounting | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 82 19.00 40 Fan Coil Units | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 82 19.00 40 Fan Coil Units | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 82 23.00 40 Unit Ventilators | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 82 23.00 40 Unit Ventilators | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 82 43.00 40 Electric Duct Heaters | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | N | UFGS 23 82 46.00 40 Electric Unit Heaters | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | N | UFGS 25 50 00.00 20 Cybersecurity of Facility-Related Control Systems | Feb-2017 | C | 1 | Clarified contractor requirements throughout. Revised the subparagraphs of 1.2.4 to remove requirements to be performed by the Government and to clarify the Contractor's requirements. CCR 5584: Revised 1.2 and 3.1 to read QUALITY CONTROL and FIELD QUALITY CONTROL, respectively. CCR 5629: Clarified 1.2.1 and 1.2.2 to provide submittal via Registered Mail. |
| May-2017 | N | UFGS 26 12 19 Pad-Mounted, Liquid-Filled, Medium Voltage Transformers | May-2017 | R | Revision included updating the minimum efficiency to meet 10 CFR 431, Subpart K, and meeting additional changes in transformer technology. | |
| May-2017 | N | UFGS 26 12 21 Single-Phase Pad-Mounted Transformers | May-2017 | R | Revision included updating the minimum efficiency to meet 10 CFR 431, Subpart K, and meeting additional changes in transformer technology. | |
| May-2017 | S | UFGS 26 28 21.00 40 Automatic Transfer Switches | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 27 05 28.36 40 Cable Trays for Communications Systems | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | N | UFGS 31 31 16.19 Termite Control Barriers | Feb-2016 | C | 1 | Changes made to include a note for Air Force to use Chemical Termite Control and deleting reference to ASTM C289 in response to CCR 4978. |
| May-2017 | A | UFGS 32 01 13 Bituminous Seal and Fog Coats | Aug-2008 | D | Superseded by UFGS 32 12 36.13 Asphaltic Seal and Fog Coats. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| May-2017 | A | UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements | Aug-2008 | D | Superseded by UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| May-2017 | A | UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving | May-2017 | N | Superseding UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements; Total review and update. | |
| May-2017 | A | UFGS 32 01 18.71 Grooving of Airfield Paving | May-2017 | N | Superseding UFGS 32 01 26.71 Grooving for Airfield Pavements; Total review and update. | |
| May-2017 | A | UFGS 32 01 26.71 Grooving for Airfield Pavements | Aug-2008 | D | Superseded by UFGS 32 01 18.71 Grooving of Airfield Paving. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| May-2017 | A | UFGS 32 01 29.61 Partial Depth Patching of Rigid Paving | May-2017 | R | Total review and update. | |
| May-2017 | A | UFGS 32 01 29.62 Concrete Pavement Raising | Aug-2008 | C | 1 | In response to CCR 2107, changed section title for compliance to the MasterFormat 2011 update. |
| May-2017 | N | UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement | Aug-2008 | D | Pervious Bituminous Concrete Pavement lacks an acceptable industry standard and the majority of Installations do not have acceptable maintenance practices in place to perform required maintenance. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| May-2017 | A | UFGS 32 12 10 Bituminous Tack and Prime Coats | Aug-2008 | D | Superseded by UFGS 32 12 13 with same title. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| May-2017 | A | UFGS 32 12 13 Bituminous Tack[ and][ Prime] Coats | May-2017 | N | Superseding UFGS 32 12 10; Total review and update with no title change. | |
| May-2017 | A | UFGS 32 12 36.13 Bituminous Fog Seal | May-2017 | N | Superseding UFGS 32 01 13 Bituminous Seal and Fog Coats; Total review and update. | |
| May-2017 | A | UFGS 32 15 00 Aggregate Surfacing | May-2017 | R | Total review and update; Section title changed from Aggregate Surface Course. | |
| May-2017 | A | UFGS 32 17 23 Pavement Markings | Aug-2016 | C | 2 | In response to CCR 5549, removed "Gradation A" from Type III beads. |
| May-2017 | S | UFGS 32 31 13 Chain Link Fences and Gates | Nov-2016 | C | 1 | Incorporated CCR 4487, revised paragraphs 2.2.15, and 2.2.17 |
| May-2017 | N | UFGS 32 84 24 Irrigation Sprinkler Systems | Aug-2011 | C | 1 | Changes made to address CCRs 5293, 5294, 5305, 5306, and 5307 |
| May-2017 | A | UFGS 33 40 00 Stormwater Utilities | Feb-2010 | C | 5 | Added requirements for field quality control. |
| May-2017 | S | UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | A | UFGS 34 71 13.16 Vehicle Crash Barriers | Feb-2015 | C | 1 | In response to CCR 4568, updated references and incorporated minor changes. |
| May-2017 | S | UFGS 40 18 00.00 40 Vacuum Systems Process Piping | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 40 18 00.00 40 Vacuum Systems Process Piping | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 42 22 00.00 40 Process Chillers and Coolers | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 42 22 00.00 40 Process Chillers and Coolers | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | F | UFGS 48 14 00 Solar Photovoltaic Systems | May-2017 | N | New Section. | |
| May-2017 | N | UFGS 48 15 00 Wind Generator System | May-2017 | N | New Section. | |
| May-2017 | A | UFGS 48 16 00 Landfill Gas Systems | May-2017 | N | New Section. | |
| Feb-2017 | N | UFGS 01 33 29 Sustainability Requirements and Reporting | Feb-2017 | R | Required revisions in order to align with numerous changes in Federal requirements and DOD policy. | |
| Feb-2017 | N | UFGS 01 35 26 Governmental Safety Requirements | Nov-2015 | C | 4 | Added crane requirements for Critical Lift Plan, Barge Mounted, and Base Mounted Drum Hoists from NAVFAC P-307 that were not in EM 385-1-1. For Navy, added requirement of accident investigation reporting within 5 days of mishaps and 10 days of accidents. |
| Feb-2017 | S | UFGS 01 75 00.00 40 Starting and Adjusting | May-2015 | D | This Section has been retired / Action Item from the Fall 2016 Specification DWG Meeting. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2017 | A | UFGS 01 91 00.15 Building Commissioning | May-2016 | C | 1 | In response to CCR 5173, added two "S" submittals in SD-11. |
| Feb-2017 | A | UFGS 02 53 13 Remediation of Contaminated Soils and Sludges by Incineration | May-2010 | D | UFGS archived. Outdated specification and no longer use incineration for contaminated soils. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2017 | N | UFGS 02 83 13.00 20 Lead in Construction | Aug-2011 | C | 1 | CCR 5279: updated paragraph 1.5.2.2 Lead Compliance Plan. |
| Feb-2017 | S | UFGS 05 51 00 Metal Stairs | Feb-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| Feb-2017 | S | UFGS 05 51 00 Metal Stairs | Feb-2017 | R | Tri-Annual Database Maintenance - Subpart 1.2 Submittal Article Compliance | |
| Feb-2017 | N | UFGS 07 22 00 Roof and Deck Insulation | Feb-2016 | C | 1 | CCR 5475: Changed terminology within this section from “Protection Board” to “Cover Board”. |
| Feb-2017 | S | UFGS 23 09 13.34 40 Control Valves, Self-Contained | Feb-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| Feb-2017 | N | UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC | Nov-2015 | C | 1 | BACnet Operator Workstation (B-OWS) updated to BACnet Advanced Operator Workstation (B-AWS) in 2.1.6.2-[BACnet Operator Workstation][and][Notebook Computer] DDC Software. |
| Feb-2017 | S | UFGS 23 22 13.35 40 Steam Traps | Feb-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| Feb-2017 | S | UFGS 23 34 23.00 40 HVAC Power Ventilators | Feb-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| Feb-2017 | S | UFGS 23 34 23.00 40 HVAC Power Ventilators | Feb-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| Feb-2017 | N | UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems | Aug-2009 | C | 4 | Updated Technical Note in 2.2.2-Fittings and End Connections (Joints) |
| Feb-2017 | N | UFGS 25 50 00.00 20 Cybersecurity of Facility-Related Control Systems | Feb-2017 | N | New Navy-only Section identifying the requirements for a NAVFAC Cybersecurity Hygiene Checklist. | |
| Feb-2017 | S | UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices | Feb-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| Feb-2017 | S | UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems | Feb-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| Feb-2017 | S | UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems | Feb-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| Feb-2017 | S | UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm | Feb-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| Feb-2017 | A | UFGS 32 01 13.64 Rejuvenation of Asphalt Pavement Surfaces | Feb-2017 | N | Superseding UFGS 32 01 22 Bituminous Rejuvenation; Total review and update. | |
| Feb-2017 | A | UFGS 32 01 16.17 Cold Milling of Bituminous Pavements | Aug-2008 | D | Superseded by UFGS 32 01 16.71 Cold Milling Asphalt Paving. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2017 | A | UFGS 32 01 16.71 Cold Milling Asphalt Paving | Feb-2017 | N | Superseding UFGS 32 01 16.17 Cold Milling of Bituminous Pavements; Total review and update. | |
| Feb-2017 | A | UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving | Feb-2017 | N | Superseding UFGS 32 01 25 Heater Scarifying of Bituminous Pavements; Total review and update. | |
| Feb-2017 | A | UFGS 32 01 22 Bituminous Rejuvenation | Aug-2008 | D | Superseded by UFGS 32 01 13.64 Bituminous Pavement Liquid Rejuvenating Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2017 | A | UFGS 32 01 25 Heater Scarifying of Bituminous Pavements | Aug-2008 | D | Superseded by UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2017 | A | UFGS 32 17 23 Pavement Markings | Aug-2016 | C | 1 | In response to CCR 5270, changed "Waterborne Paint" to "Reflective Media for Airfields" in SD-07. |
| Feb-2017 | N | UFGS 32 93 00 Exterior Plants | Feb-2010 | C | 2 | CCR 4981: References to ASTM D5203 and ASTM D5852 have been removed from this Section. |
| Feb-2017 | A | UFGS 33 46 16 Subdrainage Piping | Feb-2017 | R | Total review and update including title change from SUBDRAINAGE SYSTEM |
|
| Feb-2017 | S | UFGS 33 71 01.00 40 Overhead Transmission and Distribution | Nov-2014 | C | 1 | Changed 3 tailoring tags; corrected minor discrepancies |
| Nov-2016 | S | UFGS 01 33 00 Submittal Procedures | May-2011 | C | 9 | Replaced 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) with 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) in Subpart 1.9 SUBMITTAL REGISTER AND DATABASE. |
| Nov-2016 | N | UFGS 01 35 26 Governmental Safety Requirements | Nov-2015 | C | 3 | In paragraph "Fall Protection for Roofing Work", item b. Steep-Sloped Roofs, changed slope from "4:1" to "4:12". |
| Nov-2016 | A | UFGS 01 45 00.00 10 Quality Control | Nov-2016 | R | Total review and update. | |
| Nov-2016 | A | UFGS 01 45 00.10 10 Quality Control System (QCS) | Feb-2010 | D | Superseded by UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Nov-2016 | A | UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) | Nov-2016 | N | Superseding UFGS 01 45 00.10 10 Quality Control System (QCS); Total review and update. | |
| Nov-2016 | A | UFGS 02 83 19.00 10 Lead Based Paint Hazard Abatement, Target Housing and Child Occupied Facilities | Feb-2010 | D | Superseded by UFGS 02 83 19.13 10 Lead-Based Paint Abatement; Nontechnical number and title change. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Nov-2016 | A | UFGS 02 83 19.13 10 Lead-Based Paint Abatement | Feb-2010 | R | Superseding UFGS 02 83 19.00 10 Lead Based Pain Hazard Abatement, Target Housing and Child Occupied Facilities; Nontechnical Number and Title Revision; Did not change Section date. | |
| Nov-2016 | N | UFGS 06 13 33 Pier Timberwork | Nov-2016 | R | Revised to address changes in preservative treatments for Pier Timberwork. | |
| Nov-2016 | A | UFGS 06 17 19 Cross-Laminated Timber | Nov-2016 | N | New Section | |
| Nov-2016 | N | UFGS 07 31 13 Asphalt Shingles | Aug-2016 | C | 1 | In response to CCR #5002, added reference to ASTM D7158/D7158M for Class H roof in paragraph 2.2.1 "Shingles." |
| Nov-2016 | A | UFGS 09 06 00 Schedules for Finishes | May-2009 | R | Superseding UFGS 09 06 90 Schedules for Painting and Coating; Nontechnical Number and Title Revision; Did not change Section date. | |
| Nov-2016 | A | UFGS 09 06 90 Schedules for Painting and Coating | May-2009 | D | Superseded by UFGS 09 06 00 Schedules for Finishes; Nontechnical number and title change. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Nov-2016 | A | UFGS 09 65 00 Resilient Flooring | Aug-2010 | C | 2 | In response to CCR 4916, Luxury Vinyl Tile added. |
| Nov-2016 | N | UFGS 09 97 23.17 Corrosion Inhibitor Coating of Concrete Structures | Aug-2016 | C | 1 | Paragraphs "Penetrating Vapor Phase Corrosion Inhibitor" and "Surface Sealant' were revised to correct the product technical descriptions. |
| Nov-2016 | S | UFGS 12 31 00 Manufactured Metal Casework | Nov-2014 | C | 2 | Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.8 COLOR, TEXTURE, AND PATTERN. |
| Nov-2016 | S | UFGS 12 34 00 Manufactured Plastic Casework | Nov-2014 | C | 2 | Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern. |
| Nov-2016 | S | UFGS 12 36 00 Countertops | Aug-2016 | C | 1 | Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern. |
| Nov-2016 | S | UFGS 12 48 13 Entrance Floor Mats and Frames | Feb-2014 | C | 3 | Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.4 COLOR AND SIZE. |
| Nov-2016 | S | UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures | Nov-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
| Nov-2016 | N | UFGS 23 64 00 Packaged Water Chillers, Absorption Type | Nov-2016 | R | Complete revision. | |
| Nov-2016 | N | UFGS 23 64 10 Water Chillers, Vapor Compression Type | Nov-2016 | R | Complete revision. | |
| Nov-2016 | N | UFGS 23 65 00 Cooling Towers and Remote Evaporatively-Cooled Condensers | Nov-2016 | R | Title changed from Cooling Towers; Complete review and update concerning cooling towers and remote evaporatively cooled condensers. | |
| Nov-2016 | N | UFGS 26 51 00 Interior Lighting | May-2016 | C | 1 | Changed LED light fixtures, light sources and drivers to a 5 year warranty to meet current industry standards. |
| Nov-2016 | A | UFGS 31 11 00 Clearing and Grubbing | Aug-2008 | C | 1 | Added herbicide requirements. |
| Nov-2016 | N | UFGS 31 62 19.13 Timber Marine Piles | Nov-2016 | R | Title changed from Wood Marine Piles; Revised to address changes in preservative treatments and basis of bids for Timber Marine Piles. | |
| Nov-2016 | A | UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements | May-2016 | C | 1 | Clarified sandblasting requirements. |
| Nov-2016 | S | UFGS 32 31 13 Chain Link Fences and Gates | Nov-2016 | R | Tri-Annual Database Maintenance (TADM) completed |