Export to CSV

Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Nov-2018 A UFGS 12 21 00 Window Blinds C 2 Added requirement for materials in humid and ESC C3-C5 locations.
Nov-2018 S UFGS 12 32 00 Manufactured Wood Casework C 1 Added note for drawer bottoms, plastic laminate covered cabinet doors, and non-ferrous metal fasteners, fittings, and hardware.
Nov-2018 A UFGS 12 35 70 Healthcare Casework C 2 Added note for drawer bottoms, plastic laminate covered cabinet doors, and non-ferrous metal fasteners, fittings, and hardware. Added note prohibiting use of particle board for countertops in high humidity and C3-C5 locations.
Nov-2018 A UFGS 12 50 00.13 10 Furniture and Furniture Installation C 1 Changed title of paragraph 2.3.1 in response to CCR 6726.
Nov-2018 A UFGS 13 49 10 X-Ray Shielding C 1 Updated reference in response to CCRs 6683 and 6685.
Nov-2018 N UFGS 25 50 00.00 20 Cybersecurity of Facility-Related Control Systems D Navy-only Section, including NAVFAC Interim Technical Guidance (ITG 2017-01) – Application of Cybersecurity to Facility-Related Control Systems, is superseded by Tri-Service cybersecurity UFGS Section 25 05 11 Cybersecurity for Facility-Related Control Systems.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 26 32 13.00 20 Single Operation Generator Sets C 1 Deleted now obsolete calculation requirement for Brake Mean Effective Pressure (BMEP).
Nov-2018 A UFGS 31 11 00 Clearing and Grubbing R Complete review and update.
Nov-2018 N UFGS 31 21 13 Radon Mitigation R Periodic update.
Nov-2018 A UFGS 32 01 29.62 Concrete Pavement Raising R Complete review and update including section title change from SLABJACKING RIGID PAVEMENTS to CONCRETE PAVEMENT RAISING.
Nov-2018 A UFGS 32 17 23 Pavement Markings C 5 Updated/replaced references in response to CCR 6522.
Nov-2018 N UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks R (UFGS-33 01 50.60) Complete review and update including new Section number and title; Superseding UFGS 33 65 00 CLEANING PETROLEUM STORAGE TANKS (Aug-11)
Nov-2018 N UFGS 33 09 52 Fuel Pump Control and Annunciation System (Non-Hydrant) N New section
Nov-2018 N UFGS 33 52 10 Fuel Systems Piping (Service Station) R Complete review and update including Section title change from SERVICE PIPING FUEL SYSTEMS; Preparing Activity changed from Army to Navy
Nov-2018 N UFGS 33 52 23.15 POL Service Piping Welding R Complete review and update including new Section number and title; Superseding UFGS 33 52 90.00 20 WELDING FOR POL SERVICE PIPING (Feb-10)
Nov-2018 N UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) R Complete review and update including new Section number and title; Superseding UFGS 33 52 43 AVIATION FUEL DISTRIBUTION (NON-HYDRANT) (May-11); Preparing Activity changed from Army to Navy
Nov-2018 A UFGS 33 52 43 Aviation Fuel Distribution (Non-Hydrant) D Superseded by UFGS 33 52 40 FUEL SYSTEMS PIPING (NON-HYDRANT); Preparing Activity changed from Army to Navy.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 33 52 90.00 20 Welding for POL Service Piping D Superseded by UFGS 33 52 23.15 POL SERVICE PIPING WELDING.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 33 56 13.13 Steel Tanks With Fixed Roofs D Superseded by UFGS 33 56 21.17 SINGLE WALL ABOVE GROUND FIXED ROOF STEEL POL STORAGE TANK.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 33 56 13.15 Undertank Interstitial Space D Superseded by UFGS 33 56 21.18 SINGLE WALL POL TANK UNDERTANK INTERSTITIAL SPACE.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank R Complete review and update including new Section number and title; Superseding UFGS 33 56 13.13 STEEL TANKS WITH FIXED ROOFS (Aug-15)
Nov-2018 N UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space R Complete review and update including new Section number and title; Superseding UFGS 33 56 13.15 UNDERTANK INTERSTITIAL SPACE (Aug-15)
Nov-2018 A UFGS 33 57 00 Bulk Fuel Receiving / Dispensing Equipment D Superseded by UFGS 33 57 55 FUEL SYSTEM COMPONENTS (NON-HYDRANT); Preparing Activity changed from Army to Navy.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) R Complete review and update including new Section number and title; Superseding UFGS 33 57 00 BULK FUEL RECEIVING/ DISPENSING EQUIPMENT (Aug-11); Preparing Activity changed from Army to Navy
Nov-2018 A UFGS 33 59 00 Tightness Testing of Existing Underground Fuel Systems D Section is outdated and no longer used. Archived; no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 33 65 00 Cleaning Petroleum Storage Tanks D Superseded by UFGS 33 01 50.60 CLEANING OF PETROLEUM STORAGE TANKS.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 34 60 13 Electric Vehicle Charging Facility (EVCF) N New section
Nov-2018 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures R Complete review and update.
Nov-2018 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures R Complete review and update.
Nov-2018 A UFGS 35 41 00 Levee Construction R Complete review and update.
Nov-2018 A UFGS 35 73 13 Embankment for Earth and Rockfill Dams R Complete review and update including section title name from EMBANKMENT FOR EARTH DAMS to EMBANKMENT FOR EARTH AND ROCKFILL DAMS.
Nov-2018 A UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System D UFGS is used very infrequently. Archived; no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 A UFGS 46 73 10 Floating Cover for Sludge-Digestion Tanks D UFGS is used very infrequently. Archived; no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 A UFGS 46 76 23.16 Recessed Chamber Filter Presses D UFGS is used very infrequently. Archived; no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2018 N UFGS 01 14 00 Work Restrictions C 5 Removal of reference in para 1.6 to cancelled FAC.
Aug-2018 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules R Updated Scheduling software settings and requirements and tailoring.  Added Design-Build Requirements.
Aug-2018 A UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements R Complete review and update; Title changed from Aviation Fuel System Submittal Requirements
Aug-2018 N UFGS 01 33 29 Sustainability Requirements and Reporting C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 01 74 19 Construction Waste Management and Disposal C 3 Revised submittal classifications in response to CCR 6535.
Aug-2018 A UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems R Complete review and update.
Aug-2018 A UFGS 01 91 00.15 Building Commissioning C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 02 01 50 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems D Superseded by UFGS 02 62 16.13 10 OPERATION, MAINTENANCE AND PROCESS MONITORING FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2018 A UFGS 02 62 13.00 10 Air and Steam Stripping N Superseding UFGS 11 24 27 AIR STRIPPER. Complete review and update including section number and title changes.
Aug-2018 A UFGS 02 62 16 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems D Superseded by UFGS 02 62 16.16 10 COMMISSIONING AND DEMONSTRATION FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2018 A UFGS 02 62 16.13 10 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems N Superseding UFGS 02 01 50 OPERATION, MAINTENANCE AND PROCESS MONITORING FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS. Complete review and update including section number change.
Aug-2018 A UFGS 02 62 16.16 10 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems N Superseding UFGS 02 62 16 COMMISSIONING AND DEMONSTRATION FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS. Complete review and update including section number change.
Aug-2018 A UFGS 03 23 00 Stressed Tendon Reinforcing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 03 30 00 Cast-In-Place Concrete C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments R Complete review and update.
Aug-2018 A UFGS 05 05 23.16 Structural Welding R Complete review and update.
Aug-2018 N UFGS 05 12 00 Structural Steel R This specification was updated and revised to current industry best practices, standards, guidelines, codes, and specifications.
Aug-2018 A UFGS 05 21 00 Steel Joist Framing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 05 30 00 Steel Decks C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 05 40 00 Cold-Formed Metal Framing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 05 50 13 Miscellaneous Metal Fabrications C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 05 50 14 Structural Metal Fabrications R Complete review and update.
Aug-2018 A UFGS 05 50 15 Civil Works Fabrications R Complete review and update.
Aug-2018 A UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults R Complete review and update.
Aug-2018 A UFGS 05 59 13 Fabrication of Hydraulic Steel Structures D Superseded by UFGS 05 59 20 FABRICATION OF HYDRAULIC STEEL STRUCTURES.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2018 A UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures N Superseding UFGS 05 59 13 FABRICATION OF HYDRAULIC STEEL STRUCTURES. Complete review and update including section number change.
Aug-2018 N UFGS 06 10 00 Rough Carpentry C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 06 20 00 Finish Carpentry C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 06 61 16 Solid Surfacing Fabrications C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 21 13 Board and Block Insulation C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 21 23 Loose Fill Thermal Insulation C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 22 00 Roof and Deck Insulation C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 27 19.01 Self-Adhering Air Barriers C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 27 26 Fluid-Applied Membrane Barriers C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 27 36 Spray Foam Air Barriers C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 31 13 Asphalt Shingles C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 41 13 Metal Roof Panels C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 51 13 Built-Up Asphalt Roofing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 07 54 19 Polyvinyl Chloride Roofing C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 60 00 Flashing and Sheet Metal C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 61 14.00 20 Steel Standing Seam Roofing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 61 15.00 20 Aluminum Standing Seam Roofing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 92 00 Joint Sealants C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 11 13 Steel Doors and Frames C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 11 16 Aluminum Doors and Frames C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 14 00 Wood Doors C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 31 00 Access Doors and Panels C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 S UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 44 00 Curtain Wall and Glazed Assemblies C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 51 13 Aluminum Windows C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 51 23 Steel Windows C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 52 00 Wood Windows C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 53 00 Plastic Windows C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 08 81 00 Glazing C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 22 00 Supports for Plaster and Gypsum Board C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 22 36 Lath C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 24 23 Cement Stucco C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 26 00 Veneer Plaster C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 09 29 00 Gypsum Board C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.